Ship’s Log: Day Thirty One (Melbourne to Tilbury)

Thirty-first day of the voyage; first day of the Atlantic crossing.

On a modern bridge one finds three levels of keeping watch.

The first is the most recent and high-tech: computers for data analysis, plotting wind direction, the ship’s course and monitoring every aspect of the ship, satellite phones and screens for communication, electronic depth measuring devices (fore and aft), two different GPS devices, one for our current location, the other for waypoints, the latest radar (doubled) with information of each ship passing, electronic charts (doubled), duplicate controls on either fly-bridge, as well as the slightly older phones and walkie-talkies. All the lights, ballast control, heeling panel, Suez canal panel, alarms and fuses are on another massive counter. And this ship is nine years old, so some of this equipment is ageing.

The second level may have been reduced somewhat since the onslaught of all the gear above, but it has not been dispensed with; clinometer, dials for wind speed and direction, a clock or two, two speed dials, one on each side of the bridge and copied outside on the fly bridge. This last cluster indicates engine revs (full is up to 91 rpm, but usually we sit on 81). My favourite is the old style barometer, non-electric, hanging in a corner.

But then, despite all the equipment, new and old, nothing quite replaces ears and eyes – assisted by binoculars.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s